yephot.com

The Salvation Army - Camp del Oro

Nevada City, CA

March 2017 – December 2018

This facility has extensive site utility work, site lighting, three lodges and a multipurpose room/gymnasium. We installed all electrical infrastructure and finishes that included lighting fixtures, lighting controls, utility conduits, switchboards, panels and low voltage pathways, including bollard & pole bases, switching & automatic lighting controls, receptacles, circuits & connections, two metered switchboards, grounding & bonding, panel boards, PG&E transformer pad, PG&E underground primary & secondary services, building interconnecting LV/data conduit system, and all trenching, backfill, and compaction for site work.

Camp del Oro will be a lodge and gymnasium site.